Planned rout only at this stage.
Hill End
at 1kmActually starts and ends in Bathurst. It is almost 600km. Need to see if more can be known about the roads. And if there is a track from point H to K.
Yarrabin
at 75kmGhost Town
12 Mile
at 97kmRiver Crossing on the Cudgegong River
Glenwood Merinos
at 110kmStill on 12 Mile Rd
Uungula Wind Farm
at 119kmWind Farm
Montefiores
at 137kmWellington
at 138kmMumbil
at 248kmEglinton
at 343kmLucknow
at 395kmEuchareena
at 447kmEast Guyong
at 560kmBathurst
at 594kmKelso
at 597kmPeel
at 608km